EasyManua.ls Logo

Energomera CE208 - User Manual

Energomera CE208
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
СЕ208
САНТ.411152.068-05.1 РЭ
Operation Manual
Manufacturer:
Electrotechnical Factories Energomera JSC
415 Lenina Str., Stavropol, Russia 355029
Tel.: (8652) 35-75-27, Fax: 56-66-90,
Hot line (free): 8-800-200-75-27
e-mail: concern@energomera.ru
www.energomera.ru
Warranty service:
217 Gagarina street, Nevinnomyssk,
Stavropol region, 357106
Electric energy meter
Single-phase multifunctional
Case type S7
OKP 42 2863 6
Harmonized System Codes (TN VED) 9028301 100
Question and Answer IconNeed help?

Do you have a question about the Energomera CE208 and is the answer not in the manual?

Summary

1 SAFETY REQUIREMENTS

2 METER DESCRIPTION

2.2 Designation of meter modifications

Explains the structure and meaning of meter designations, detailing different modifications and their features.

2.3 The meter is certified

States that certification information is available in the CAHT.411152.068-03.1 Data Sheet.

2.4 Normal operating conditions

Specifies the environmental parameters required for the meter's normal operational performance.

2.5 Operating usage conditions

Details the conditions under which the meter should be connected and used within AC networks.

2.6 Ambient conditions

Describes the meter's resistance to climatic influences, mechanical impacts, dust, and water.

2.7 Technical specifications

Lists the key technical specifications and standards the meter complies with, including tolerances.

2.8 Meter design

Describes the physical construction and components of the meter, including its front panel features.

3 PREPARING THE METER FOR OPERATION

3.1 Unpacking

Provides instructions for unpacking the meter and performing visual inspection for damages.

3.2 Preparing for operation

Covers initial setup, factory settings, and important notes before putting the meter into operation.

3.3 Installation procedure

Details the step-by-step process for connecting the electric meter to the AC power network.

3.4 Wiring diagrams

Illustrates the designation of meter contacts and provides wiring information for various interfaces.

3.5 Lithium cell replacement

Explains the procedure and precautions for replacing the meter's integrated or additional lithium cell.

3.6 Meter configuration

Guides users on how to configure the meter's settings according to manufacturer specifications.

4 READING THE METER

4.1 Displaying information on the LCD

Details the output formats for measured, calculated, and accumulated parameters displayed on the meter's LCD.

4.2 Viewing total accumulated values (on an accrual basis)

Describes how to view accumulated energy amounts by tariff and type on the meter's LCD.

5 METER VERIFICATION

6 MAINTENANCE AND SEALING

7 ROUTINE MAINTENANCE

8 STORAGE AND TRANSPORTATION CONDITIONS

9 CONTAINERS AND PACKING

10 LABELING

ANNEX A Permissible error limits

ANNEX B CE208 S7 meter general appearance

ANNEX C CE208 S7 meter connection diagram

Energomera CE208 Specifications