EasyManua.ls Logo

Energomera CE208 - 3 PREPARING THE METER FOR OPERATION; 3.1 Unpacking; 3.2 Preparing for operation

Energomera CE208
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18 19
• optical port elements;
• «FRAME» and «VIEW» buttons;
The clamps for connecting the meter to the network, to interface lines and to pulse outputs,
«ACCESS» button are closable with a plastic cover.
In order to access the «ACCESS» button (programming permission), you need to remove the sealing label of the energy
supplying company that installed the meter.
The meter comprises:
• measuring module;
• supply module;
• load control relay (Q) module;
• one or two current sensors (shunts), depending on the version.
3 PREPARING THE METER FOR OPERATION
The meter is supplied with a set of everything necessary for installation at operating site.
The САНТ.411152.068-05.1 РП has a comprehensive set of information for installing the meter at operating site.
3.1 Unpacking
3.1.1 After unpacking, inspect the meter visually, verify that there are no mechanical damages, and check
the presence and integrity of the seals.
3.2 Preparing for operation
3.2.1 The meters produced by the manufacturer have factory settings. Changes to factory settings are made in
accordance with the САНТ.411152.068-05.1 РП by companies authorized to configure the meter.
ATTENTION! PRESENCE OF READINGS ON THE METERING DEVICE IS CAUSED BY CHECKING THE METER
AT THE MANUFACTURER’S, AND DOES NOT ATTEST TO ITS WEAR OR OPERATION.

Related product manuals