EasyManua.ls Logo

Enterasys Matrix-V V2H124-24 - Mounting; Rack Mounting; Figure 3-2. Attaching the Brackets

Enterasys Matrix-V V2H124-24
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting
3-3
3
Mounting
This switch can be mounted in a standard 19-inch equipment rack or on a desktop or
shelf. Mounting instructions for each type of site follow.
Installing Optional Modules: Before mounting the switch, you may want to install
optional modules. If you have purchased optional slide-in 100BASE-FX,
1000BASE-T, 1000BASE-T/SFP, or stacking modules, install these modules now,
following the instructions “Installing an Optional Module into the Switch” on page 3-5.
Rack Mounting
Before rack mounting the switch, pay particular attention to the following factors:
Temperature: Since the temperature within a rack assembly may be higher than
the ambient room temperature, check that the rack-environment temperature is
within the specified operating temperature range. (See page C-1.)
Mechanical Loading: Do not place any equipment on top of a rack-mounted unit.
Circuit Overloading: Be sure that the supply circuit to the rack assembly is not
overloaded.
Grounding: Rack-mounted equipment should be properly grounded. Particular
attention should be given to supply connections other than direct connections to
the mains.
To rack-mount devices:
1. Attach the brackets to the device using the screws provided in the Bracket
Mounting Kit.
Figure 3-2. Attaching the Brackets

Table of Contents

Other manuals for Enterasys Matrix-V V2H124-24

Related product manuals