EasyManua.ls Logo

Enviro PILATUS PC12 - Page 55

Enviro PILATUS PC12
89 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Component Maintenance Manual
12037 N Highway 99
Seminole, OK 74868
Phone (405) 382-0731
Fax (405) 382-0737
http://www.enviro-ok.com
Copyright © 2017
ATA 21-00-23
Page | 55
Revision 10
June 1, 2017
9.2.1.12 Install the fan blade per Section 9.2.4
9.2.1.13 Install the motor into the Compressor Condenser Module Assembly per Section
9.2.5
9.2.1.14 Operate the motor for 1 hour without the belt installed (no load). After 1 hour the
brushes must be checked for proper seating as illustrated below. If the brushes
are not fully seated after 1 hour of operation, the motor must be operated for
another hour and continued until the brushes are fully seated.
Note: Operating the motor without fully seated brushes does not allow for efficient current
transfer and will cause higher heat and current loads and will reduce motor life.
9.2.1.15 Once the brushes are fully seated, route the brush shunt leads as shown in the
following illustrations.

Table of Contents