08
Toilet installation
Precaution before installing
Minimum dynamic working water pressure:
0.09MPa or more (3.96Gal/min(15L/min) or
more), failure to meet this pressure will not
achieve the best flushing effect.
Remark:
Apply the methods below if you
don’t have water pressure testing device.
Draw drain outlet centerline on the floor,
Install angle valve at proper position on
wall according to dimension of toilet.
1. Installation of mating angle valve
Line
Drain outlet
Mating angle valve
305mm
Drain outlet
2. Cardboard installation
Align cardboard with the centerline of
drain outlet;
Draw contour line according to cardboard;
Angle valve connector
3.Hose
Connect the water inlet and angle valve of the
toilet with the matching hose and tighten it
Inlet connector
Flexible hose
Open the angle valve and connect water inlet
for 10s, once the water volume is above 0.66Gal
(2.5L), the minimum water pressure of the
product is ensured.
Angle valve in
the package
Hose in the
package
Water storage
barrel
5/8′′
Installation Method 2:
15/16-14UNS
Installation Method 1:
NPT 1/2
Choose the correct size of mating angle
valve that compatible with your water
oulet from the package.