Do you have a question about the ERLO TC.25 and is the answer not in the manual?
Procedures for lifting and transporting the machine using cranes and auxiliary equipment.
Guidelines for site selection, foundation, and environmental conditions for machine installation.
Proper electrical connections, voltage checks, and utility requirements for startup.
Procedures for inserting, adjusting, and automatically ejecting tools.
How to adjust table height, inclination, and rotation.
Changing spindle speeds and selecting automatic or manual feed rates.
Adjusting drilling depth and engaging/disengaging feed mechanisms.
Using pair limiter, shank locking, and understanding safety indicators.
Identification and resolution of common machine problems and repair procedures.
Performing lubrication and scheduled maintenance for optimal machine performance.
| Drilling capacity in steel | 25 mm |
|---|---|
| Tapping capacity in steel | M20 |
| Chuck capacity | 1 - 16 mm |
| Frequency | 50 Hz |
| Motor power | 1.5 / 2.2 kW |
Loading...