Do you have a question about the ERLO TC-32 and is the answer not in the manual?
Details required for ordering spare parts.
Instructions for safe machine movement and lifting operations.
Site selection, foundation, and pre-start checks for machine installation.
Procedure for inserting tools into the spindle taper.
Adjusting the table height and securing the support unit.
Adjusting the table inclination using nuts and ruler.
Adjusting the table rotation and locking it.
Procedure for changing spindle speeds safely.
Setting the drilling depth using locking nuts and a screw.
Engaging and disengaging the sensitive manual feed.
Operation of the automatic tool ejector device.
Locking the shank, recommended for milling operations.
Ensuring all parts and holding items are securely fastened.
Adhering to command positions and danger indicator plates.
Care when working with manual/automatic feed due to spindle return spring.
Operations must be performed by skilled staff with safety measures.
Capacity of the coolant tank for TC.32/TC.35 models.
Weekly greasing schedule for oil and grease points.
Greasing points requiring attention every 48 hours.
Annual oil change for the gearbox mechanism.
Recommended lubricants and their specifications by supplier.
Diagrams showing numbered components of the machine.
Detailed list of machine parts with descriptions in multiple languages.
List of parts specific to the headstock assembly.
List of parts for the column and support structure.
Instructions for handling and manipulating the machine.
Details on cage and maritime packaging methods.
Weights for different machine models in various packaging types.
Information on additional equipment and accessories.