21 Changi South Street 1 Singapore 486777 Phone: +65 65420833 Fax: +65 65426920
E-mail: ductless@escoglobal.com Website:
www.escoglobal.com/ductless
USER SECTION
Chapter 5 – MAINTAINING YOUR CABINET
CHAPTER 5
MAINTAINING YOUR CABINET
5.1 MAINTENANCE SCHEDULE
COSHH regulations from the UK Health & Safety Executive (HSE) require that equipment to control
exposure is properly maintained. It must be thoroughly examined and tested every fourteen (14) months
and records kept of this. This 14-monthly period specified suggests annual maintenance with two months
grace which is equivalent to Esco annual maintenance schedule.
In view of this, proper and timely maintenance is crucial for trouble free functioning of any device and
your Esco cabinet is no exception to this rule. We strongly recommend that you follow the maintenance
schedule suggested hereunder in order to obtain optimal performance from your Esco cabinet.
Maintenance work to be carried out weekly
1. Check the alarm and measure the basic airflow (Please refer to the test report for details).
2. Clean the interior work surface and walls with soap water
3. Wipe down sash with appropriate glass cleaner.
Maintenance work to be carried out monthly
1. Inspect the controls of the services to the ductless fume cabinet for proper operation.
2. Clean the exterior surface of the fume hood with damp cloth.
3. Determine the face velocity and ensure that ductless fume cabinet is operating at specified face
velocity (please refer to Appendix B).
Maintenance work to be carried out quarterly
1. Inspect the fans, motors, drives and bearings for correct operation
2. Check fluorescent tubes and to ensure that they are functioning normally (only applicable for SPD).
3. Check filter saturation (please refer to Appendix A).
4. Measure the fume hood face velocity (please refer to Appendix B). Correct as necessary.
5. Test the operation of the airflow alarm
6. Repair defects and lubricate as necessary.
7. For removing stubborn stains / spots on the stainless steel surface, make use of MEK (Methyl-Ethyl-
Ketone). In such cases, make sure that you wash the steel surface immediately afterwards with clean
water and some liquid detergent. Use polyurethane cloth or sponge for washing. Regularly cleaning
the stainless steel surface would help you retain the attractive factory finish.
Maintenance work to be carried out annually
1. Have the cabinet recertified by a qualified certification technician.
2. Quarterly maintenance prescribed above.
Maintenance work to be carried out biannually
1. Replace the fluorescent lamps (only applicable for SPD).
2. Annual maintenance prescribed above.