EasyManua.ls Logo

Everlast EV500 - Page 12

Everlast EV500
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pulley Assy #3 and #9
Pulley Assy #4
Pulley Assy #2
Pulley Assy #1
1
2
10 & 12
4
3
9
UPPER CABLE (35)
L = 2310 mm
11
Assembly Instructions
Assembly 2310mm Upper Cable (35)
Note : Assemble pulley wheel as
you thread the cable. As you will
be unable to thread the cables
with the pulley wheel in situ.
a. With Upper Cable (35) in groove
of Pulley No.1 (32) thread cable
through Upper Cross Beam (9).
b. Install Pulley NO.1(32) to Upper
Cross Beam (9) using one Hex
Bolt (57), two Washers (64) and
one Nylock Nuts (67).
c. Install Pulley No.2 (32) to
Support Frame (8) using one
Hex Bolt (57), two Washers (64)
and one Nylock Nuts (67).
d. Install Big Pulley NO.4 (33)
Upper Cross Beam (9) using one
Hex Bolt (57), two Washers (64)
and one Nylock Nut (67).
e. Attach the bolt end of Upper
Cable (35) to Selector Shaft (5)
with Plastic Washer (26).
f. Attach the other end of Upper
Cable (35) to Lat Bar (16) using
one Pothook (20).
g. Install pulley NO.3 (32) to Pulley
U (13) using one Hex Bolt (57),
two Washers (64) and one
Nylock Nut (67).

Related product manuals