EasyManua.ls Logo

Extech Electronics 7611 - Chapter 14: Calibration Procedures

Default Icon
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CALIBRATION PROCEDURES
51
CHAPTER 14 : CALIBRATION PROCEDURES
14.1 Calibration
Press the calibration button on the rear panel when the display shows:
Calibrate 7611
Press CAL button
A complete calibration includes:
1. Meter auto null
2. Meter gain calibration
3. Meter ratio auto check
4. DUT voltmeter calibration
5. Measuring Device calibration
Procedure 1 and 3 are internal and automatic. Procedure 2, 4, and 5 require the
following equipment:
1. AC 120V source with Standard AC Voltage meter
2. Standard Current Meter, 10mA range
3. 1K
1/4W Resistor
4. DC source with 2.2V and 3.1V capability
14.2 Enter The Maintenance Mode
Press and hold the calibration key on the rear panel with a pen, pencil or small
screw driver while powering ON the 510L. The 510L enters maintenance mode
after the power on sequence is complete. The initial screen will show:
Maintenance mode
SETUP for menu
Use the SETUP key to scroll through the menu. The selections are Calibration,
EEPROM Initialization, and Restore Default MD:F.
14.2.1
Calibration Initialization
Press the SETUP key, the program will advance to the Calibration
selection mode. The display will show:
Calibrate 7611
Press CAL button
Please refer to section 2. for the actual calibration procedure.