EasyManua.ls Logo

FAAC 402 Operator - Connect Main Power Supply

FAAC 402 Operator
23 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 13
August, 2002
402 Installation
CONNECT THE MAIN POWER SUPPLY
WARNING! Turn the main power off before you
make any electrical connections or set any switches
inside the control panel box.
Wire the main power supply to control panel terminals
in block J1 (see Figures 8 and 9). The installer is
responsible for insuring that a separate, grounded
circuit protected by a circuit breaker is between the
control panel and the main power supply. All wiring
should conform to applicable electrical codes, and all
wiring and fittings should be weatherproof and/or
suitable for burial.
Connect the ground to the grounding terminal in block
J1 and connect the power wires to the terminals labeled
N (neutral) and L (phase).
CAUTION: The operators are grounded only by
the grounded circuit the installer provides.
N
OTE: For a 230V system, a neutral is not
needed. Connect one 115V line to the L (Line)
and a second 115V line to the N (Neutral
terminal).
1 J1 terminal block for main power supply FUSES 220 VAC 115 VAC
2 J2 terminal block for connecting the operator(s) 10 F1, Main power 5 A 10 A
3 J3 terminal block for low-voltage accessories 11 F2, Accessories 800 mA 800 mA
4 J4 quick connector port 12 F3, Electric lock 1.6 A 1.6 A
5 Pressure adjustment potentiometer 13 F4, Microprocessor 250 mA 250 mA
6 Pause time potentiometer
7 Potentiometer for adjusting open/close time
8 Leaf delay potentiometer
9 DIP switch assembly
Figure 8. The 450 MPS control panel

Related product manuals