EasyManua.ls Logo

FAAC 750 Standard User Manual

FAAC 750 Standard
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
The 750 Swing Gate Operator
and 450 MPS Control Panel:
Installation Manual
Contents
Important Safety Information........................................................................2
Technical Data ..............................................................................................4
The 750 Operator ................................................................................... 4
The Control Panel ..................................................................................4
Unpacking the Operator ................................................................................ 5
The 750 Swing Gate Operator ......................................................................6
General Characteristics ........................ Error! Bookmark not defined.
Operating Logic ................................... Error! Bookmark not defined.
Manual Release Lever MechanismError! Bookmark not defined.
450 MPS Logic Modes ................. Error! Bookmark not defined.
Installation Instructions................................................................................. 9
Preparing the Gate..................................................................................9
Installing the 750 Operator ....................................................................9
Set the Concrete Forms................................................................... 9
Install the Power Unit ...................................................................11
Install the Drive Unit ....................................................................12
Connect the Hydraulic Lines ........................................................ 12
Synchronize the Hydraulic System..............................................13
Install the Gate Leaf Shoe.............................................................13
Install the Gate Leaf......................................................................15
Installing the Control Panel .................................................................15
Connect the Main Power Supply .................................................. 15
Connect One Activating Device ..................................................17
Connect the Operator(s) to the Control Panel.............................. 18
Adjust the Pressures for the Operator ........................................... 18
Check the Motor’s Direction of Rotation ....................................20
Connect Other Devices .................................................................20
Set Other Operating Controls .......................................................23
Bleeding the Hydraulic System........................................................... 24
Adjusting the Bypass Valves ............................................................... 24
Installing an Extension Arm........................................................................26
Maintenance ................................................................................................ 27
The 750 Operator ................................................................................. 27
The Control Panel ................................................................................27
Troubleshooting ..........................................................................................27
Exploded View, 750 CBAC........................................................................ 31
Exploded View, 750 Ram Parts ..................................................................32
750 Flex-Hose Adapter Kit ......................................................................... 33
FAAC International, Inc.
303 Lexington Avenue
Cheyenne, WY 82007
www.faacusa.com
Question and Answer IconNeed help?

Do you have a question about the FAAC 750 Standard and is the answer not in the manual?

FAAC 750 Standard Specifications

General IconGeneral
Model750 Standard
Max Gate Length5 m
Operating Temperature-20°C to +55°C
Cycles per hour30
Battery BackupOptional
Operating Voltage230V AC
Power Supply230 Vac
Opening Time15-30 seconds

Summary

Important Safety Information

Gate Design Safety

Safety considerations for gate placement and structural integrity to prevent traffic hazards.

Installation Safety Guidelines

Precautions and requirements for safe installation of gate operators to prevent injury or death.

Operator Use Precautions

Guidelines for safe operation and maintenance of the gate operator system to prevent misuse.

Technical Data

750 Operator Specifications

Technical specifications for the 750 operator, including dimensions, power, and oil requirements.

450 MPS Control Panel Details

Information on the 450 MPS control panel, including voltage requirements and available logics.

Unpacking the Operator

Power Unit and Drive Unit Unpacking

Instructions for unpacking the power unit and drive unit and identifying all components.

The 750 Operator

General Characteristics

Overview of the 750 operator's capabilities, construction, and locking features.

450 MPS Logic Modes

Explanation of available operating logic modes for the 450 MPS control panel.

Logic Mode Operation Tables

Tables detailing gate behavior for A, S, B, E, EP, C logic modes.

Installation Instructions

Preparing the Gate

Criteria for gate leaf preparation before installing the 750 operator.

Setting the Concrete Forms

Guidelines and dimensions for preparing concrete footings for the gate operator.

Install the Power Unit

Instructions for mounting and connecting the power unit box.

Install the Drive Unit

Steps for positioning and welding the drive unit mounting brackets.

Connect the Hydraulic Lines

Procedures for connecting hydraulic lines between the drive and power units.

Synchronize the Hydraulic System

Steps to synchronize the hydraulic system after connecting lines.

Install the Gate Leaf Shoe

Instructions for installing the gate leaf shoe, including shear-pin assembly.

Install the Gate Leaf

Procedure for installing the gate leaf onto the drive unit and hinges.

Connect the Main Power Supply

Instructions for connecting the main power supply to the control panel.

Connect One Activating Device

How to connect a single activating device to the control panel.

Connect the Operator(s) to the Control Panel

Wiring instructions for connecting the gate operator to the control panel.

Adjust the Pressures for the Operator

Critical steps for adjusting hydraulic pressure settings on the operator.

Check the Motor's Direction of Rotation

Procedure to verify the correct rotation direction of the operator motor.

Connect Other Devices

Guidance on connecting additional accessories like reversing devices.

Set DIP Switches and Logic Modes

Configuration of DIP switches for operating logic and gate behavior.

Adjust the Potentiometers

How to adjust potentiometers for torque, pause time, and operation time.

Bleeding the Hydraulic System

Critical steps to remove air from the hydraulic system for proper operation.

Adjusting the Bypass Valves

Procedure for adjusting bypass valves to set safety pressure limits.

Installing an Extension Arm

Extension Arm Installation

Instructions for installing an extension arm for specific gate configurations.

Maintenance

The 750 Operator Maintenance

Recommended maintenance schedule for checking oil and pressure settings.

Control Panel Maintenance

Note that the control panel requires no maintenance.

Troubleshooting

Gate Not Responding to Signal

Steps to diagnose why the gate does not respond to an activating signal.

Radio Controlled Opener Issues

Troubleshooting steps for a radio-controlled opener not opening the gate.

Gate Not Opening/Closing Smoothly

Diagnosing and resolving issues with jerky gate movement or oil problems.

Related product manuals