EasyManua.ls Logo

FAAC 780D User Manual

FAAC 780D
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
carta riciclata 100%
per la natura
for nature
recycled paper 100%
ist umweltfreundlich
100% Altpapier
para la naturaleza
100% papel reciclado
papier recyclÈ 100%
pour la nature
voor de natuur
100% kringlooppapier
844ER & 780D
844ER & 780D

Other manuals for FAAC 780D

Question and Answer IconNeed help?

Do you have a question about the FAAC 780D and is the answer not in the manual?

FAAC 780D Specifications

General IconGeneral
Model780D
CategoryGate Opener
Max Gate Weight800 kg
Power Supply230V AC
Motor Voltage24 Vdc
Operating Temperature-20°C to +55°C
Protection ClassIP44

Summary

Installer Warnings and Safety

General Safety Obligations

Essential safety instructions for installers covering safe use, handling, and precautions.

System Overview and Specifications

Description and Technical Specifications

Overview of the system's purpose, operation, and key technical data.

Maximum Use Curve

Guidance on establishing maximum work time based on operational frequency for optimal performance.

Installation Procedures

Preliminary Checks

Essential pre-installation checks for gate suitability, soil stability, and electrical provisions.

Foundation Plate Installation

Instructions for preparing and installing the foundation plinth and plate for the operator.

Mechanical Installation

Procedures for physically mounting the operator and connecting mechanical components.

Rack Installation

Detailed steps for attaching the rack to the gate, including welding and screwing methods.

Chain Pinion Installation

Instructions for fitting chain pinions for Z16 or Z20 versions of the 844 system.

Control Board 780D and Wiring

Control Board Warnings

Critical safety precautions before performing work on the control board.

Control Board Technical Specifications

Detailed electrical and operational parameters of the 780D control unit.

Control Board Layout and Components

Identification and description of the control board's connectors, LEDs, and other components.

Electric Connections and Wiring

Guidance on wiring photocells, safety devices, motors, lamps, and power supply.

Terminal Board Connections

Specific wiring instructions for J7 (Power), J6 (Motors/Lamp), and J1 (Accessories).

System Programming

Basic Programming

How to access and configure fundamental system functions using basic programming mode.

Advanced Programming

Detailed configuration options for advanced system behavior and parameters.

Force and Opening Direction Settings

Adjusting motor thrust force and gate opening direction parameters.

Braking and Deceleration Settings

Configuring final braking, pre-limit, and post-limit switch deceleration.

Encoder, Photocell, and Logic Settings

Configuring encoder presence, photocell logic, and function logic for gate behavior.

Work Time and Cycle Programming

Setting the maximum work time and the number of system operation cycles.

Start-Up, Checks, and Final Operations

Electric Connections and Earthing

Finalizing all electrical hookups to the control board, including earthing.

Opening Direction and Limit-Switch Setup

Defining gate direction and setting limit-switch positions for proper operation.

Limit-Switch Installation

Procedures for installing MLS and inductive limit switches on the rack.

Input Status Checks

Verifying the status of system inputs via LED indicators.

Mechanical Clutch Adjustment

Setting the mechanical clutch for torque control and safety.

Final Installation Operations

Applying safety stickers and completing the final installation steps.

Manual Operation and System Restoration

Manual Gate Operation

How to operate the gate manually in case of power failure or system malfunction.

Restoring Normal Operation

Process for re-engaging the gate's automated operation after manual use.

Optional Installations

CN 60E Control Unit Installation

Instructions for housing and installing the CN 60E safety edge control unit.

Remote Board 578D Installation

Guidance on installing the 578D remote control board separately from the operator.

Board 462DF Installation

Instructions for installing the 462DF control board using an adapter kit.

Maintenance and Repairs

Regular Maintenance Checks

Recommended checks and intervals for maintaining system efficiency and safety.

Transformer-Board Unit Disassembly

Step-by-step guide for safely disassembling the transformer and board unit.

Oil Level Checks and Top-Ups

Procedures for checking and topping up the oil level in the operator.

Repair Information

Information on contacting authorized centers for system repairs.

User's Guide

General Safety Regulations for Users

Basic rules for safe behavior around the automated system to prevent accidents.

Automated System 844 Description

Overview of the system's design, operation, and key features for vehicle access control.

Manual Operation Procedure

Steps to manually operate the gate during power outages or system malfunctions.

Restoring Normal Operation

Process for re-engaging the gate's automated operation after manual use.