EasyManua.ls Logo

Faema E92 Elite - Installation Check-Up

Faema E92 Elite
61 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal. 
The pressure gauge is working properly. 
The self-leveling device is working properly.
The expansion valves are working properly
6. Installation Check-up
WARNING$)7(5,167$//$7,21&+(&.726((,)7+(0$&+,1(,6:25.,1*3523(5/<VHHWKH
Installation Module C)
GROUPS
+RRNXSWKH¿OWHUKROGHUVWRWKHJURXSVZLWKRXWFRIIHH
Let each group dispense water for about a minute.
HOT WATER
Continuously dispense hot water (pressing the appropriate button) until at least 6 liters of water have been used for a ma-
chine with 2 groups, 9 liters for a machine with 3 groups and 12 liters for a machine with 4 groups (see the “Cleaning and
Maintenance” Chapter in the Users Manual).
STEAM (also with Autosteam)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
CAPPUCCINO MAKER (automatic cappuccino maker device)
After removing the intake tube from the milk container, carry out a few test cycles.
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
:25.(572 67$5786,1*7+(0$&+,1(:$6+7+(,17(51$/&20321(176$&&25',1*727+(
INSTRUCTIONS BELOW:
47
English

Related product manuals