EasyManua.ls Logo

Farm King 13'' - Order of Operations

Farm King 13''
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation - Teleswing
36
IMPORTANT
1
2
During Swing: Tip hopper up to raise hand
truck wheels (Item 1).
During Extension: Tip hopper down to raise
drive wheels (Item 2).
IMPORTANT
The Teleswing auger may be swung or
retracted freely with the PTO running as long
as the spline shaft at the top does not become
disengaged.
On the 13” Teleswing auger there is 20” of free
movement back from full extension.
WARNING
13” Teleswing Models:
Do NOT exceed 540 RPM PTO
Keep PTO shields and all guards in place
Keep away from moving parts
Keep bystanders away
Order of Operations
IMPORTANT
Before operation:
Fully extend the Farm King auger hitch
Make sure the PTO is at optimal length for
operation
1. Position auger over bin for unloading.
2. Lower the Teleswing from transport and swing
around to appropriate unloading position. The
Teleswing should be perpendicular to auger.
3. Fully retract the Teleswing.
4. Move the unloading unit into position. Center the
discharge chutes of the unloading unit 2 ft. from the
end of the Teleswing hopper.
5. Lower the Teleswing hopper tip and extend hopper
under unloading unit.
6. Raise hopper tip slightly off the ground and swing
to position roughly centered below appropriate
discharge chute.
7. Lower hopper tip onto ground.
8. ENGAGE PTO on tractor or power unit.
9. Unload until empty and close chute.
10. Raise hopper tip and swing to the other chute. Lower
hopper tip onto ground once in position.
11. Unload until empty and close chute.
12. DISENGAGE PTO on tractor or power unit.
13. Fully retract the Teleswing auger.
14. Move the next unloading unit into position.

Related product manuals