a D:GROUP company
00020EN Rev.09 – 12/2012 20
6 OPERATING PROCEDURES
6.A PRELIMINARY CHECKS
Before carrying out any type of work, the following conditions should be verified:
-
that the cabinet power cable is connected to a 230V-50Hz outlet (if not distinct voltages/frequencies are shown
on the label stuck near the power cable)
-
that the work area inside the cabinet is free from materials used during the previous session
-
that the work chamber has been cleaned/sterilized.
6.B SWITCHING ON the FLOWFAST H CABINET
To switch on the cabinet, proceed as indicated below:
-
Switch on the cabinet by pressing the key ON/OFF (if the PCB for the automatic regulation is installed
insert the password: press the button 5 , button 4 and then the button SET )
-
Switch on the lighting, by pushing the key
The cabinet is ready to work. Wait 5 minutes before starting any operation (see chapter 5).
During this period of time, introduce ALL and ONLY the material indispensable for working in the
internal working zone of the cabinet.
6.C SWITCHING OFF FLOWFAST H CABINET
At the end of the work session, proceed as follows:
-
Remove the material from the internal work chamber
-
Clean the work surface and the inside walls of the chamber, as indicated in the “Cleaning instructions” (chapter
7A)
-
Turn off the light by pushing the key
-
Turn off the cabinet by pressing the "ON/OFF” key (if the PCB for the automatic regulation is installed
insert the password: press the button 5 , button 4 and then the button SET )) or press the "SPEED
REDUCTION" key
In case UV lamp is installed in the cabinet, switch on the germicidal lamp by pushing the “U.V.” yellow button .
The U.V. lamp will switch on only if the front protective shutter is completely down.