EasyManua.ls Logo

Fimap GENIE E - END OF WORK PROCEDURES; Machine Shutdown Sequence; Draining and Tank Management; Brush Cleaning After Use

Fimap GENIE E
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
AT THE END OF THE WORK
At the end of the work, and before carrying out any type of maintenance, perform the following
operations:
1. turn off the solenoid valve switch (3).
2. raise the squeegee by means of the rear handle.
3. turn off the suction switch (2).
4. Turn off the main switch (1).
5. disconnect the power cable from the mains socket.
6. Take the machine to the location designated for draining the water.
7. Disconnect the suction pipes
8. Disconnect the hook securing the recovery tank on the rear of the machine.
9. Remove the recovery tank.
10. empty the recovery tank by removing the caps and tilting it
11. disassemble the brush and clean it with a jet of water (to disassemble the brush, see
“DISASSEMBLING THE BRUSH” below)
ATTENTION: This operation must be carried out wearing gloves to
protect against contact with dangerous solutions.

Related product manuals