Fluke 6200-2 - PELV Test; To perform the PELV test

Fluke 6200-2
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6200-2
Users Manual
18
To perform the IEC Lead test:
1. Connect the IEC lead as indicated on the Tester, see Figure 6.
MEM
PRINT
BON
D
2
00
mA
BOND
25 A
I
N
S
U
L-
A
T
I
O
N
I
S
U
B
L
OA
D
/
L
EA
K
I
TO
U
CH
IE
C
L
E
AD
Z
E
R
O
CLEAR
I
P
E
<
3
.
5
m
A
(
0
.
75mA
P
OR
T
AB
L
E
A
P
P
LI
ANC
E
)
I
N
S
U
L
A
T
I
O
N
I
S
U
B
BO
ND
Z
E
R
O
I
E
C
L
E
AD
E
AR
T
H
B
O
N
D
L
O
AD
/
L
E
A
K
I
T
OUCH
I
T
O
U
C
H
<
0
.
25
m
A
R
I
S
O
>
1.
0
M
C
l
a
s
s
I R
I
S
O
>
2
.
0
M
C
l
a
s
s
I
I
R
PE
<
0
.1
R
I
S
O
>
1
.
0
M
C
l
a
s
s
I
R
P
E
200
mA
,
R
P
E
2
5
A
R
P
E
<
0
.
1
+
L
E
A
D
P
R
O
BE
O
N
L
Y
W
I
T
H
C
L
ASS
II
A
PP
L
I
AN
C
E
62
00-2
APPLIA
N
CE TESTE
R
hdc02.eps
Figure 6. IEC-Lead Test Connections
2. Push to start the test.
The IEC Lead test is done only in the single test mode.
Earth bond, insulation, L-N open, L-N short and L-N polarity (UK and AU)
results show on the display.
3. Push to store the test result, if required.
Note
1. In the case that an earth bond limit of >1 or an insulation test
limit of <2 M are met, the IEC Lead test is prevented.
2. In the case that an earth bond limit is met, but is <1 , the symbol
shows, and the complete IEC Lead test sequence is
performed.
3. If the insulation test value falls below the limit of 1 M both
symbols “<1 M CI and <2 M CII” show on the display.
PELV Test
The PELV (Protective Extra Low Voltage) test measures the voltage on the PROBE PELV
input when the idle screen shows.
To perform the PELV test:
1. Push to revert to the idle screen if it is not already shown.
2. Connect the test probe to the Tester PROBE PELV input and connect the appliance
to a mains supply socket.
3. Apply the test probe to the test point.
The display shows the test result. If PELV is above the acceptable limit, then
>PEL VAC shows on the display instead of the mains voltage.
4. Push to store the test result, if required.