EasyManua.ls Logo

Fluke 8270A - Page 35

Fluke 8270A
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
High-Pressure Modular Controller
Main Menu
31
Table 12. Tasks
1
2
5
3
4
6
huo013.eps
Item Indicator/Name Function
Leak Test
Opens a menu to configure and do a leak test on the system. See
Leak Test.
Switch Test Preprogrammed task to test a pressure switch dead band.
Exercise Opens a menu to configure and exercise a DUT. See Exercise.
D Program
Automated testing interface to make, edit, modify, save, and run a
user-configured automated test. See Program.
E
CPS Cleanout
(Disabled when
CPS is OFF in the
Setup Menu)
Predefined sequence that cleans out the CPS with low pressure.
Useful after testing a very dirty DUT where cross contamination
could be a factor.
F
Purge
(Disabled when
CPS is OFF in the
Setup Menu)
Opens a menu to configure and purge the DUT and CPS. See Purge
(if CPS is installed).

Table of Contents

Related product manuals