Multifunction PV Analyzer
Te s t S e t u p
23
Quick V
OC
/I
SC
Measurement
Yo u ca n t a ke a q u i c k V
OC
/I
SC
measurement without connecting the Irradiance Meter or
PV model. Pass/Fail limits or Irradiance data do not show with this type of measurement.
To take a measurement:
1. Turn the rotary switch on the PV Analyzer to V
OC
/I
SC
.
2. Connect the test leads to the solar panel. The V
OC
measurement automatically shows on
the display.
Tip: Push
to see a connection diagram.
Voltage symbol is on when voltage is 50 V.
3. Push
to start the I
SC
measurement.
The V
OC
and I
SC
results show on the display. The Pass/Fail icons do not show in this
configuration.
4. Push
to save the results to memory.
A confirmation message with ID number shows on the display and then returns to the test
screen.
V
OC
/Operational Current Measurement
Operational current as alternative method for I
SC
as required by IEC 62446-1 Clause 6.5.3.
To take a measurement:
1. Connect the PV string to the inverter and switch the system to on and normal operation
mode (inverter must be at maximum power point).
It is useful to connect two Y-connectors in between so you can measure the string voltage
in parallel.
2. Turn the rotary switch to V
OC
/I
SC
.
3. Connect the test leads to the solar panel.
The V
OC
measurement automatically shows on the display.
Tip: Push
to see a connection diagram.