Warning!
Power to the unit must be turned on only after installation work
has been completed. All electrical connections must be carried
out by qualified personnel in accordance with legislation in
force in the country concerned.
Note!
Please set the inverter if it is the first time to start up.
The above steps are for the regular start-up of the inverter. If it is
the first time to start up the inverter, you need to setup the
inverter.
Start inverter
·
Inverter will start automatically when PV panels generate enough energy.
·
Check the status of LED and LCD screen, the LED should be green and the
LCD screen should display the main interface.
·If the LED is not green, please check the below:
-
All the connections are right.
-
All the external disconnect switches are closed.
-
The DC switch of the inverter is in the “ON” position.
Below is the three different states when operating, which means inverter
starting up successfully.
Waiting: Inverter is waiting to check when DC input voltage from panels is
greater than 80V (lowest start-up voltage) but less than 120V(lowest operating
voltage), green LED is flashing.
Checking: Inverter will check DC input environment automatically when DC
input voltage from the PV panels exceeds 120V and PV panels have enough
energy to start inverter, green LED is flashing.
Normal: Inverter begins to operate normally with green light on. Meanwhile
feedback energy to grid, LCD displays present output power.