INSTALLATION
General starting points for installation
Perform the following steps before starting installation.
Stop valves must already be installed.
Close the stop valves.
In existing installations, remove the tap, hoses and boiler if still in place.
Mark the existing cold and hot water connection.
Do not connect the M-Box to a hot water pipe.
There must be two wall plug sockets available for connection.
Installation video
Guide for the standard installation for the 4-in-1:
https://youtu.be/4KPGVG_MoZg
Installation steps
Installing 4-in-1 tap (see page 3)
Installing M-BOX (see page 5)
Installing 5 or 10 litre boiler (see page 7)
Connecting 4-in-1 tap (see page 11)
Connecting 4-in-1 tap with hot water out of existing pipe (see page 13)
Connecting 4-in-1 tap with the Bypass option (see page 14)
Connecting the drain hose (see page 15)
Commissioning (see page 17)