6 INSTALLATION
6.1 Preparations
– The main power connection for the coffee machine must be protected by a residual current circuit-
breaker (RCCB).
– Each terminal of the power supply must be able to be interrupted using a switch.
– The water connection must comply with
Requirements of the water supply [
}
23]
and local and
national rules and regulations.
– The coffee machine must be connected to the water supply with the supplied hose kit. Do not use any
other water hoses that happen to be present.
– Ensure that the coffee machine can be placed on a horizontal and stable support with a load capacity
of min. 150 kg. The operator panel should be at eye level and allow ergonomic operation.
You must have completed these preparations before one of our service technicians can install the coffee
machine for you. Your service technician will install your coffee machine and carry out the initial commis-
sioning process. He will instruct you in the basic functions.
6.2 Dimensions
All dimensions are specified in mm.
Front/side view