2.5 Installing the new combustion chamber
NOTICE! Before installing the combustion chamber, note the colour markings. Only
stones with a red marking may be installed!
❒
Position the pallet provided in front of the boiler
❒ Place the bottom of the new combustion chamber on the pallet and boiler base
❒
Place the top of the new combustion chamber on top of the bottom
❒ Insert the secondary air bushing into the top of the combustion chamber from the
outside
➥ The flat part must be facing down
❒
Unscrew the clamping screws until the thread of the screws no longer protrudes
into the bushing
2
Replacing the combustion chamber
Installing the new combustion chamber
8 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com