EasyManua.ls Logo

Froling T4 Series - Page 30

Froling T4 Series
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Place the transport cover over the openings of the ash container
Put on the ash container cover, pull out the transport lever and take the ash
container to the emptying point
After emptying the ash container:
Replace the ash container in the boiler and clamp with the locking lever
Replace the cover and secure with the clamps
Make sure that the pin is inserted in the limit switch correctly.
4
Boiler Servicing
Inspection and cleaning
30 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com

Table of Contents

Related product manuals