3 Operating the System
3.1 Assembly and initial startup
Assembly, installation and initial startup of the boiler must only be carried out by
qualified staff, and these procedures are described in the accompanying assembly
instructions.
NOTICE! See assembly instructions for theT4
NOTICE
Optimum efficiency and efficient, low-emission operation can only be guaranteed
if the system is set up by trained professionals and the standard factory settings
are observed.
Take the following precautions:
❒
Initial startup should be carried out with an authorised installer or with Froling
customer services
The individual steps for initial start-up are explained in the operating instructions for
the controller
NOTICE! See operating instructions for boiler controller!
The customer is responsible for ensuring the following prior to initial start-up of the
system by Froling customer services:
▪
Electrical installation
▪ Installation of water pipes
▪ Connect flue gas including all insulation work
▪ Work must comply with local fire protection regulations
▪ Correct assembly / setting of the air duct according to firewood used, see boiler
assembly instructions
▪ The necessary "dry run" of the system means that the discharge system must be
empty at the start of initial startup. Fuel must be available, however, so that the
discharge system can be filled once the system is released.
▪ It is essential that the electrician who has carried out the installation work is
available when starting up the system for the first time to make any changes to the
wiring which may become necessary.
▪ During initial start-up, operating staff are shown how to use the boiler. It is
imperative for proper handover of the product that those involved are present as
this is a one-off opportunity.
Operating the System
3
Assembly and initial startup
Operating Instructions T4 24-150 | B0830317_en 21