5. Adding a Connecting Device
Connection Procedure When Adding a Server
FUJITSU Storage ETERNUS AF, ETERNUS DX Configuration Guide (Power Synchronized Unit)
Copyright 2019 FUJITSU LIMITED P3AM-8012-14ENZ0
63
End of procedure
After the procedure is complete, check that power synchronization performs normally if necessary.
Power synchronized unit
Server#1
Server#2
UPS unit for
Server#2
Server#3
UPS unit for
Server#3
Server#0
UPS unit for
Server#1
UPS unit for
Server#0
AC sensor unit
Power cord (for AC sensor)
(Must be obtained by customers)
AC sensor port connection cable
(provided with an AC sensor unit)
Added server
Added server
AC In port
Branch connector
AC SENSOR port