EasyManua.ls Logo

Furrion NET-ZERO FSCC30PW-BL - Page 10

Furrion NET-ZERO FSCC30PW-BL
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
Installation
English
2. Affix MPPT controller to the wall with 4
mounting screws (not included). (Figure 2)
Fig. 2
3. Loosen the ground lug screw located on
the left side of the mounting bracket.
Insert a 10AWG copper wire from this lug
to chassis ground. Tighten the ground
lug screw securely. The suggested torque
force should be 25lbs-inch. (Figure 3)
Ground lug
10AWG
copper wire
Fig. 3
4. Plug the temperature sensor connector
to the temperature sensor port (if
applicable). (Figure 4)
Temperature sensor
Fig. 4
5. Plug the RV-C connector to the MPPT
controller. (Figure 5)
RV-C connector
Fig. 5

Related product manuals