EasyManuals Logo

FUTABA 2PC User Manual

FUTABA 2PC
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
88
88
8
Before Operation
Battery cover
Open
AA size Batteries
(x8)
Battery Replacement
Handling Procedure For Bat-
teries (8 AA Size Batteries)
(Battery Replacement Method)
1Remove the batteries from the trans-
mitter by sliding the cover in the di-
rection of the arrow in the figure.
2Remove the used batteries.
3Load the new AA size batteries . Pay
very close attention to the polarity
markings and reinsert accordingly.
4Side the battery cover back onto the
case.
(Check)
Turn the power switch on the trans-
mitter to the ON position. Check to
see if the three LEDs light.
If the LEDs fail to light, check the
batteries for insufficient contact in the
case or incorrect battery polarity.
Caution
Always be sure you reinsert the batteries
in the correct polarity order.
If the batteries are loaded incorrectly , the
transmitter may be damaged.
When the transmitter will not be used for
any short or long period of time always
remove the batteries.
If the batteries do happen to leak , clean
the battery case and contacts thoroughly.
Make sure the contacts are free of corro-
sion.
(Battery Disposal)
Some states require special handling
when any type of battery is disposed.
Contact the State Agency responsible
for recycling hazardous waste for pro-
cedures in your area.
(Battery Alarm Display)
When the Green battery level indica-
tor (LED) goes off and the Red LED
flashes, change the batteries immedi-
ately.
BATT LEVEL
MID
FULL
LOW/CHARGE
(Behind cover)
(Green Off)
(Green Off)
(Red Flashing)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the FUTABA 2PC and is the answer not in the manual?

FUTABA 2PC Specifications

General IconGeneral
BrandFUTABA
Model2PC
CategoryRemote Control
LanguageEnglish

Related product manuals