If there is enough space between the gate and the wall after the gate completely
open, then safety stopper is not a must option. (Motor will stop after it’s
blocked)
8. Installation Steps
8.1 Preparation Before Main Machine Installation
a) Before installing the gate opener, please confirm that the gates were installed
correctly, ensure that the gate can be manually operated smoothly, and the limit
stopper can effectively prevent the gate to continue moving.
b) Please keep a distance of 15-20mm between the two swings for installing the
electric lock. If electric lock is not required, then no need to consider the distance
between the two swings;
c) The recommended mounting height of the 2 main machines is around 300 ~
800mm above the ground, and make sure there are reliable fixed points for mounting
brackets.
Cable Bury
In order to ensure the normal operation of the gate opener and protect the cable from
damage, please use two PVC pipes to bury the motor and power cables, and the
control cables separately. One PVC pipe for motor and power cables, the other one
for control cables.
Mounting Brackets Fixing
In order to install the SW200DC main machines firmly, it is recommended to use the
expansion screws to fix the mounting brackets.
8.2 Accessory Installation
A) Before installing the main machines, please install the wall bracket on the wall first,
then fix the connecting bracket, finally install the front mounting bracket on the gate.