EasyManuals Logo

GE ADTS542F User Manual

GE ADTS542F
153 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #42 background imageLoading...
Page #42 background image
PREPARATION
[EN] English 33 K0553 Revision D
4) Make sure the air vents do not become obstructed.
5) Connect the required hoses to the ADTS that are necessary for the test procedures to be
carried out.
6) Fit the necessary adaptors for aircraft testing to the hoses.
NOTE: When connected, take care not to kink or stand on the hoses.
7) Fit blanks to all the adaptor test points.
8) Carry out the leak test procedure detailed in Section ADTS leak check.
9) If necessary carry out an altitude correction, see Figure 2-1 also.
NOTE: Read the whole procedure before starting the test process on an aircraft or
component.

Table of Contents

Other manuals for GE ADTS542F

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ADTS542F and is the answer not in the manual?

GE ADTS542F Specifications

General IconGeneral
BrandGE
ModelADTS542F
CategoryTest Equipment
LanguageEnglish

Related product manuals