Comment/specifyN/ANOYESRequirement
Space requirements
Space is available as specified.
Environmental requirements
The proper environmental conditions are fulfilled
as specified.
Ambient temperature
Relative humidity
Altitude
Electrical requirements
Electrical requirements are fulfilled as specified.
User supplied equipment
Personal Protective Equipment (PPE)
as required, (e.g., gloves, lab coats, etc.)
13 mm wrench (or ratchet wrench with 13
mm socket)
Electrical TX25 screwdriver or power driver
with a hexalobular TX25 bit
Safety knife
Buffer and waste vessels
Balance
Flexible hoses and TC connections
Reference Manuals System Binder I, II and
III
User supplied consumables
Purified water (e.g., WFI/MQ)
Acetone solutions (1.0%, 0.5% and 0.1%)
pH solutions (pH 4.00 and 7.00)
Conductivity solutions
Sodium chloride (for gradients only)
14 ÄKTAprocess Site Preparation Guide 29-1396-55 AA
3 Site preparation checklist

Other manuals for GE AKTAprocess

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTAprocess and is the answer not in the manual?

GE AKTAprocess Specifications

General IconGeneral
BrandGE
ModelAKTAprocess
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals