EasyManuals Logo

GE AKTAprocess Site Preparation Guide

GE AKTAprocess
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
Space requirements
The following space requirements must be fulfilled at the location where the ÄKTAprocess
system will be installed:
SpecificationParameter
2050 x 2250 mmMinimum floor area for operating the
ÄKTAprocess 6 mm, 10 mm 3/8 and 1/2
system
(Cabinet 10)
(including 1 m of free space around the
system to allow service and mainte-
nance)
2050 x 3200 mmMinimum floor area for operating the
ÄKTAprocess 1 SS and PP system
(Cabinet 30)
(including 1 m of free space around the
system to allow service and mainte-
nance)
Horizontal +/- Floor inclination
WARNING
Access to power cord. Do not block access to the power cord. The
power cord must always be easy to disconnect.
6 ÄKTAprocess Site Preparation Guide 29-1396-55 AA
2 Site preparation overview

Other manuals for GE AKTAprocess

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTAprocess and is the answer not in the manual?

GE AKTAprocess Specifications

General IconGeneral
BrandGE
ModelAKTAprocess
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals