GE AKTAprocess Site Preparation Guide

GE AKTAprocess
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #4 background imageLoading...
Page #4 background image
Site preparation tasksPersonnel
Site preparation/
installation
coordinator
Review the site preparation guide for safety information and system re-
quirements.
Choose the site.
Coordinate personnel and tasks.
Coordinate the installation timing of the system with any domestic safety
procedures and testings.
Order the required materials.
Schedule the installation and inform the relevant personnel of the instal-
lation date.
Laboratory personnel/
Primary users
Review the safety information.
Make sure that all customer-provided materials for the installation are
present at the site.
Facilities personnel
Make sure that the installation requirements are met for:
-
Space at the installation site
-
Environmental conditions
-
Biosafety
-
Ventilation and waste collection
-
Electrical supply
-
Safety and installation materials
The personnel at the customer facility are also responsible for making sure that the instal-
lation requirements are met for:
Note:
Compressed air supply
Network communication (if applicable)
4 ÄKTAprocess Site Preparation Guide 29-1396-55 AA
1 Introduction

Other manuals for GE AKTAprocess

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTAprocess and is the answer not in the manual?

GE AKTAprocess Specifications

General IconGeneral
BrandGE
ModelAKTAprocess
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals