EasyManua.ls Logo

GE Evolve - EASC Power Door Installation Procedure

GE Evolve
11 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Evolve™ LED Area Light
Scalable Fixtures (EAS)
Troubleshooting
and Repair Guide
Section 3: Power Door Replacement (EASC) (continued)
Re-attach door in reverse order of removal.
Match up colors of leads from new door with fixture leads and assemble with provided
quick connectors.
Verify that all leads are in the correct place after rewiring. Check against wiring sticker
located on top of drivers.

Other manuals for GE Evolve

Related product manuals