EasyManua.ls Logo

GE GEH - 4 Check and Storage; Check before Receiving; Deliverables; Storage

GE GEH
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
04 Check and Storage
User Manual V1.0-2023-10-30
4 Check and Storage
4�1 Check Before Receiving
4�2 Deliverables
Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and other signs of
equipment damage. Do not unpack the package and contact the supplier as soon as possible if any
damage is found.
2. Check the inverter model. If the inverter model is not what you requested, do not unpack the
product and contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact the
supplier as soon as possible if any damage is found.
NOTICE
The number of pin terminals, PV connectors, and battery connectors are various depending on
di󰀨erent inverters. The actual accessories may di󰀨er.
PV connector: GEH15-3U-10/GEH20-3U-10: 4 x PV+/PV-; GEH25-3U-10/GEH29.9-3U-10/GEH30-
3U-10: 6 x PV+/PV-.
Battery connector: GEH15-3U-10/GEH20-3U-10: 1 x BAT+/BAT-; GEH25-3U-10/GEH29.9-3U-10/
GEH30-3U-10: 2 x BAT+/BAT-.
BMS communication cable: GEH15-3U-10/GEH20-3U-10: 1; GEH25-3U-10/GEH29.9-3U-10/
GEH30-3U-10: 2; Meter communication cable GEH15-3U-10/GEH20-3U-10: 1; GEH25-3U-10/
GEH29.9-3U-10/GEH30-3U-10: 1.
WARNING
Connect the DC cables with the included terminals. The manufacturer shall not be liable for the
damage if other terminals are used.