09 Maintenance
User Manual V1.0-2023-10-30
9�5 Routine Maintenance
Maintaining Item Maintaining Method Maintaining Period
System Clean
Check the heat sink, air intake, and air outlet
for foreign matter or dust.
Once 6-12 months
DC Switch
Turn the DC switch on and o󰀨 ten
consecutive times to make sure that it is
working properly.
Once a year
Electrical Connection
Check whether the cables are securely
connected. Check whether the cables are
broken or whether there is any exposed
copper core.
Once 6-12 months
Sealing
Check whether all the terminals and ports
are properly sealed. Reseal the cable hole if
it is not sealed or too big.
Once a year
THDi Test
For Australia requirements, in the THDi test,
there should add Zref between inverter and
mains.
L: 0.24 Ω + j0.15 Ω; N:0.16 Ω +j0.10 Ω
L: 0.15 Ω + j0.15 Ω ; N:0.1 Ω + j0.1 Ω
As needed.
WARNING
Make sure that the inverter is powered o󰀨.
Wear proper PPE before any operations.