EasyManua.ls Logo

GE JBP78

GE JBP78
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
iiiiiiiili"rliiiii'f !ll
Installationoftherange.
E
Read these instructions completely and carefully.
3-Wire ConduitInstallation
Remove tim 3 screws flom tim connector block. Insert bme x_dresbet_veen the
connector block terminals and movable nuts. Tighten screws securely. Do not
remove ground strap connection.
WARNING: connector block is approved for Copper wire Connection
only ff aluminum wire is used, see note below.
NOTE: ALUMINUM WIRING
i_ Do not connect aluminum wire to the connector bk)ck.
Use copper building x@e rated fbr the correct amperage and voltage to
make 3 (three) 3" copper jumper x@es. (_onneut wire as per Step 6 or 7
depending on number ofx@es.
i_ Splice copper x@es to aluminum wiring using special connector terminals
designed and UL-approved fbr joining copper to aluminum and follow the
connector manut_tclurer's recolnmended procedure closely.
Wireused,locationandenclosureofspfices,etc,,mustconformto goodwiringpractices
andlocalcodes,
'__. i_ _'_Screw
'_'_Connectorblockterminal
i Flexiblecable
Connectorblock
..<.
Barewiretips

Other manuals for GE JBP78

Related product manuals