GE 
Direction 5370626-100, Revision 18              LOGIQ e/LOGIQ e Vet/LOGIQ i/Vivid  e Basic Service Manual
Chapter 4 Functional Checks 4-3
4-3-1-1 Scanner Power On (cont’d)
When power is applied to the scanner, power is distributed to the Cooling Unit, Control Panel, LCD, 
Peripherals and the Back-end Processor.
4-3-1-2 Turn on the system
Press the Power On/Off switch at the front of the system once.
When the Power On/Off switch on the Control Panel is pressed once, the Back-end Processor starts 
and the software code is distributed to initiate the scanner.
No status messages are displayed during this process.
4-3-2 Power Off/ Shutdown
NOTE: After turning off a system, wait at least ten seconds before turning it on again. The system may not be 
able to boot if power is recycled too quickly.
4-3-2-1 Back-end Processor Power Down
To power down the system:
1.) Press the Power On/Off switch at the front of the system once.
2.) The System-Exit window is displayed. 
3.) Using the Trackball or Select key, select Shutdown.
Figure 4-33   Power On/Off Switch 
Figure 4-1  System Exit Window