Site Preparations
2-14 LOGIQ V3/V5/V5 Expert – Basic Service Manual
5726264-100 English Rev.8
2-3-3 Required facility needs
NOTE: GE requires a dedicated power and ground for the proper
operation of its Ultrasound equipment. This dedicated power
shall originate at the last distribution panel before the Ultrasound
system.
Sites with a mains power system with defined Neutral and Live
:
The dedicated line shall consist of one phase, a neutral (not
shared with any other circuit), and a full size ground wire from
the distribution panel to the Ultrasound outlet.
Sites with a mains power system without a defined Neutral
:
The dedicated line shall consist of one phase (two lines), not
shared with any other circuit, and a full size ground wire from the
distribution panel to the Ultrasound outlet.