G500 SUBSTATION GATEWAY INSTRUCTION MANUAL GE INFORMATION 19
G500 Substation Gateway
Chapter 3: Installing the G500
Instal ling the G5 00
This chapter covers the installation of the Industrial Computer and initial power-on
operations.
Before you install and operate the G500, read and follow the safety guidelines and
instructions in “Safety precautions” on page 11.
Installation
Mounting instructions
The G500 is mounted in 3U slot of a 19” rack by use of 6 screws compliant to IEC60297-3
with STD hole Pattern.
Screws Use screws with a shaft diameter close to 5mm. For example, M5 or UNF 10-32 screws.