EasyManua.ls Logo

GE Multilin G500 - Page 21

GE Multilin G500
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 3: INSTALLING THE G500
G500 SUBSTATION GATEWAY INSTRUCTION MANUAL GE INFORMATION 21
3. Attach the unit by aligning the two screws with the keyhole mounting points of the
brackets.
4. Once aligned, set down the unit and then tighten the screws.
The recommended tool torque settings for zinc-plated mounting screws are:
10-32 UNF screws use 22.2 in-lb [2.50 Nm]
12-24 UNC screws use 31.0 in-lb [3.51 Nm]
M5x0.45 screws use 18.1 in-lb [2.04 Nm]

Table of Contents

Related product manuals