EasyManua.ls Logo

GE PACSystems IC695CPU3104 - Mounting the Energy Pack Directly on a Panel

GE PACSystems IC695CPU3104
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Energy Packs
GFK-2741D June 2015 19
3.2.4.2 Mounting the Energy Pack Directly on a Panel
Caution
Over tightening the mounting screws could crack the plastic housing.
Heat dissipation: When mounting the Energy Pack on a panel, allow a minimum clearance of 25.4mm (1) on the
four sides of the unit (right, left, top and the bottom).
Recommended fasteners: Four M4-0.7 machine screws with minimum length of 25mm (or 8-32, 1” min. length) and
nuts.
1. Drill four mounting holes using the spacing shown in the following drawing.
2. Use the machine screws and nuts to attach the Energy Pack to the panel.
2.610"
66.294mm
4.070"
103.378mm
0.188"
4.763mm
Drilling Pattern for Direct Panel Mounting

Table of Contents

Related product manuals