EasyManua.ls Logo

GE SF6 - Page 105

GE SF6
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Lifting and positioning the pole
GE Information L31- 7606EN/04
3/4
03- 2017
Lifting the pole
Process
By means of a lifting device hoist the pole up whilst allowing it to rest on the
base of the frame.
Place the trip ropes (10) on the support legs of the chassis frame (9) to ensure
guidance of the pole at the time of lifting.
Lift the pole with precaution.
10
9

Related product manuals