EasyManuals Logo

GE SF6 User Manual

GE SF6
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #127 background imageLoading...
Page #127 background image
Installation
Vacuum operation
GE Information08- 2016 L31- 881EN04
5/6
Vacuum operation with nitrogen purging (N
2
), continued
Vacuum operation,
continued
The table below gives the continuation of the steps of the vacuum operation
with nitrogen purging (N
2
):
Step Action Comment/Diagram
6 Disconnect the tube (12) from the
filling tool (4).
12
4
7 Remove the filling tool (4) with
the valve cap.
4
8 Connect the vacuum pump and
open the tap (1)
to bring the
volume of pole back to ambient
pressure (filled with nitrogen at
0.03 MPa).
Open
Closed
1
9 Carry out a new simple
vacuum operation.
1 mbar (100 Pa)
during 1 hour.
END OF PROCEDURE

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE SF6 and is the answer not in the manual?

GE SF6 Specifications

General IconGeneral
BrandGE
ModelSF6
CategoryCircuit breakers
LanguageEnglish

Related product manuals