EasyManua.ls Logo

GE UR T60 - Page 469

GE UR T60
724 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Multilin T60 Transformer Protection System 7-5
7 COMMANDS AND TARGETS 7.1 COMMANDS
7
be used. If both the PMU under test and the test set use the timing reference, they should be driven from the same IRIG-B
signal: either the same GPS receiver or IRIG-B generator. Otherwise, the setpoints of the test set and the PMU measure-
ments should not be compared as they are referenced to different time scales.
Figure 7–2: USING THE PMU ONE-SHOT FEATURE TO TEST SYNCHROPHASOR MEASUREMENT ACCURACY
COLLECTING SYNCHRONIZED MEASUREMENTS AD HOC:
The one-shot feature can be used for ad hoc collection of synchronized measurements in the network. Two or more PMU
can be pre-scheduled to freeze their measurements at the same time. When frozen the measurements could be collected
using EnerVista UR Setup or a protocol client.

Table of Contents

Related product manuals