EasyManuals Logo

GE Vivid E90 User Manual

GE Vivid E90
382 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #60 background imageLoading...
Page #60 background image
Site Preparations
2-6 Vivid E80/E90/E95 – Service Manual
GC091052
Rev. 3
Power plug
If the Ultrasound system arrives without a power plug, or with
the wrong plug, you must contact your GE dealer or the
installation engineer must supply what is locally required.
Power stability requirements
Voltage drop-out:
Max 10 ms.
Power transients (all applications):
Less than 25% of nominal peak voltage for less than 1
millisecond for any type of transient, including line frequency,
synchronous, asynchronous, or aperiodic transients.

Table of Contents

Other manuals for GE Vivid E90

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Vivid E90 and is the answer not in the manual?

GE Vivid E90 Specifications

General IconGeneral
BrandGE
ModelVivid E90
CategoryMedical Equipment
LanguageEnglish

Related product manuals