EasyManua.ls Logo

GE Vivid E80 User Manual

GE Vivid E80
382 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Technical Publication
Vivid™ E80 / Vivid™ E90 / Vivid™ E95
Version 201
Service Manual
Direction Number: GC091052
Rev. 3
BASIC SERVICE DOCUMENTATION.
COPYRIGHT GENERAL ELECTRIC COMPANY.
© 2014-2015 General Electric Company. All Rights Reserved.

Table of Contents

Other manuals for GE Vivid E80

Question and Answer IconNeed help?

Do you have a question about the GE Vivid E80 and is the answer not in the manual?

GE Vivid E80 Specifications

General IconGeneral
BrandGE
ModelVivid E80
CategoryMedical Equipment
LanguageEnglish

Summary

Chapter 1 Introduction

Manual Overview

Provides an overview of the service manual and the models it covers.

Important conventions

Details conventions, icons, and safety messages used throughout the document.

Safety considerations

Outlines crucial safety precautions for operating and servicing the equipment.

Dangerous procedure warnings

Highlights potentially dangerous procedures and mandatory warnings.

Lockout/Tagout (LOTO) requirements

Specifies essential procedures for energy control and power lockout.

Returning probes and repair parts

Provides guidelines for the proper return and shipment of probes and parts.

Electromagnetic compatibility (EMC)

Explains EMC and the system's compliance with emission and immunity standards.

Electrostatic discharge (ESD) prevention

Details essential precautions to prevent damage from electrostatic discharge.

Customer assistance

Provides contact information and procedures for obtaining customer support.

Chapter 2 Site Preparations

General Ultrasound system requirements

Details environmental and operational requirements for the ultrasound system.

Electrical requirements

Specifies the necessary electrical installations and power outlet requirements.

EMI limitations

Discusses susceptibility and generation of Electromagnetic Interference (EMI).

EMI prevention/abatement

Provides tips and rules for preventing and abating EMI.

Probes environmental requirements

Details operational and storage temperature requirements for ultrasound probes.

Facility needs

Outlines purchaser responsibilities and requirements for the installation site.

Desirable features

Lists recommended features for an optimal ultrasound facility setup.

Minimal floor plan suggestion

Provides a suggested minimal floor plan layout for the ultrasound system.

Recommended floor plan suggestion

Presents a recommended floor plan layout for the ultrasound system.

Suggested floor plan, Ultrasound system, and EchoPAC PC in same room

Illustrates a floor plan with the ultrasound system and EchoPAC PC.

DICOM option setup requirements

Details the information required to configure DICOM network functionality.

Environmental Dangers

Describes environmental hazards and patient vicinity standards.

Chapter 3 System Setup

Setup reminders

Provides crucial setup warnings and reminders before system installation.

Receiving and unpacking the equipment

Details procedures for safely receiving and unpacking the ultrasound system.

The Tilt and Shock indicators

Explains the function of tilt and shock indicators for transportation monitoring.

Receiving the Vivid E80/E90/E95

Provides instructions for examining packages upon delivery.

Damage in transportation

Outlines the procedure to follow if damage is apparent upon delivery.

Unpacking the Vivid E80/E90/E95

Describes the step-by-step process for unpacking the ultrasound system.

Packing materials - recycling information

Provides information on the recyclability of packing materials.

Preparing for setup

Details essential steps for preparing the system before final setup.

Completing the setup

Guides through the final steps to complete the system setup.

Electrical specifications

Lists the electrical specifications for the Vivid E80/E90/E95 models.

Connections on the I/O Rear Panel

Details connections for Ethernet and USB Flash Card on the rear panel.

Connections on the Patient I/O panel

Describes connections for ECG and Heart Microphone on the front panel.

Connecting probes

Provides an introduction to connecting various types of ultrasound probes.

Connect a probe

Step-by-step instructions for connecting an ultrasound probe.

Disconnect a probe

Step-by-step instructions for safely disconnecting an ultrasound probe.

Configuration

Covers system configuration settings including location and date/time.

Enter location

Procedure for entering location details like hospital and department.

Adjust Date and Time

Instructions for adjusting the system's date and time settings.

Select language for User Interface and Online manuals

Guide to selecting the preferred language for the UI and manuals.

Select Units of Measure and Video format

Instructions for selecting measurement units and video format.

Service Screen setup

Details on how to access and set up the service screen.

Alphanumeric Keyboard configuration

Instructions for configuring the alphanumeric keyboard layout.

Add printer

Procedure for adding a printer to the system.

Optional peripherals/peripheral connection

Lists and describes approved internal and external peripherals.

Software Options configuration

Guide to installing and configuring software options using keys.

Connectivity overview

Provides an overview of the system's physical connection methods.

Wired Ethernet from Vivid E80/E90/E95 to a workstation

Details methods for connecting the system via wired Ethernet.

Connectivity setup

Covers compatibility and setup procedures for system connectivity.

Select TCP/IP Screen

Instructions for navigating and viewing network settings on the TCP/IP screen.

Changing the AE Title and/or Port Number (Port No.)

Procedure for modifying the AE Title and Port Number settings.

DHCP setup

Guides on configuring the system for DHCP network usage.

Set the Remote Archive’s Network Information

Details configuring network information for connecting to a remote archive.

Product Locator Installation Card

Information regarding the product locator installation card.

Chapter 4 General Procedures and Functional Checks

General procedures

Covers general procedures including power operations and system checks.

Connect AC (mains) Power to the Vivid E80/E90/E95

Steps for connecting AC power, including preliminary safety checks.

Switch ON the AC Power to Vivid E80/E90/E95

Procedure for powering on the ultrasound system and observing boot sequence.

Power shut down

Details the automatic shutdown sequence and available exit options.

Complete power down

Step-by-step guide for performing a complete power down of the system.

Creating presets

Instructions on how to create custom presets for system operation.

Functional checks

Covers various functional checks for system modes like 2D, M-Mode, and Color.

Adjust the 2D mode controls

Guidance on optimizing the 2D mode display using various controls.

M Mode Checks

Details on M-Mode overview, usage, and optimization techniques.

Color Mode Checks

Explains Color Mode overview and how to use color imaging features.

PW/CW Doppler Mode Checks

Covers PW/CW Doppler modes, their overview, and usage instructions.

Tissue Velocity Imaging (TVI) Checks

Explains TVI mode, its overview, and how to use and optimize it.

Probe/Connectors Checks

Procedure for checking probes and their connections to the system.

ECG Check

Instructions for performing an ECG check on the ultrasound system.

Cineloop Check

Details on checking the cineloop functionality for image sequences.

Back End Processor checks

Information on checking the functionality of the Back End Processor.

Operating Panel Test

Procedure for testing the functionality of the system's operating panel.

Peripheral checks

Includes checks for printers and other system peripherals.

Windows Print Test Page

Steps for testing printer installation and connectivity at the Windows level.

Mechanical Functions Checks

Covers checks for mechanical functions like panel movement and casters.

Chapter 5 Components and Functions (Theory)

Software overview

Provides an overview of the system and application software.

InSite ExC

Details the InSite ExC feature for remote service and support.

InSite ExC Status

Describes the different states and icons associated with InSite ExC.

InSite ExC Definitions

Provides definitions for InSite ExC states like Disruptive and Non-Disruptive.

Initiating a Request for Service (RFS)

Step-by-step guide to initiating a service request through InSite ExC.

Exiting InSite ExC

Procedure for properly exiting the InSite ExC remote connection.

Vivid E80/E90/E95 overview

Provides a general overview of the Vivid E80/E90/E95 ultrasound system.

Vivid E80/E90/E95 block diagram

Illustrates the system's block diagram showing key components and connections.

Signal flow overview

Describes the signal flow and data processing within the ultrasound system.

System configuration and software

Details system configuration storage and software loading process.

Operating Panel

Describes the user interface and controls on the operating panel.

The electronics

Overview of the system's electronics divided into FEP and BEP card cages.

Operating modes

Lists the various scanning modes supported by the Vivid E80/E90/E95.

Top Console with LCD monitor and Operating Panel

Describes the components and features of the top console assembly.

Connection from the Top Console to the rest of the Vivid E80/E90/E95

Details the electrical connections between the top console and the system.

Description of the Locking Mechanism

Explains the locking mechanism for the console and its operation.

Operating Panel (Control Panel)

Provides a detailed diagram and description of the operating panel controls.

Key illumination

Describes the illumination states of the control panel keys.

The alphanumeric keyboard

Information about the location and function of the alphanumeric keyboard.

Main Console

Describes the main console structure and the components it houses.

Air Flow control

Details the air flow components and software control for temperature management.

Casters and brakes

Describes the casters, brakes, and pedal mechanism functions.

Chapter 6 Service Adjustments

LCD Monitor adjustments

Provides cautions and warnings related to LCD monitor adjustments.

LCD backlight adjustment

Instructions for accessing and adjusting LCD and touch screen backlight.

Adjust LCD brightness and contrast

Guides on adjusting the LCD's brightness and contrast settings.

Chapter 7 Diagnostics/Troubleshooting

Service safety considerations

Highlights safety considerations, including DANGER and WARNING messages.

Gathering Troubleshooting Data

Describes how to acquire trouble images and system data for analysis.

Collect a ‘trouble image’ with logs

Procedure for collecting screen captures and log files for troubleshooting.

Screen captures

Explains how to capture screen images for diagnostic purposes.

Troubleshooting

Addresses common troubleshooting issues like XY Lock and Z Movement.

Motor controller test

Procedure for testing the XYZ Motor Controller and its lock function.

Chapter 8 Replacement Procedures

Warnings and important information

Provides critical warnings and essential information before performing replacements.

Returning/shipping probes and repair parts

Guidelines for returning equipment, including decontamination requirements.

Manpower - When two persons are needed

Specifies tasks requiring two-person assistance for safety and efficiency.

Tools needed for servicing Vivid E80/E90/E95

Lists the required tools and hardware for servicing the ultrasound system.

Loading the software

Instructions for loading software from a USB Flash Drive (UFD).

Setup after software loading

Procedure for system setup after software has been loaded.

Replacing covers and bumpers

Covers replacement procedures for side, top, front, and rear covers/bumpers.

LCD Monitor and LCD Arm parts replacement

Procedures for replacing the LCD monitor and its associated arm assembly.

Upper OP Panel/Touch Panel Assembly replacement

Steps for removing and installing the upper operating panel/touch panel assembly.

Lower Operating Panel Parts replacement

Details replacement procedures for lower operating panel components.

Replacing the Trackball

Procedure for removing and installing the system's trackball.

A/N Keyboard parts replacement

Instructions for replacing the alphanumeric keyboard assembly.

Wagon AN Drawer Sheet Met. Assembly replacement

Procedure for replacing the wagon AN drawer sheet metal assembly.

Other Top Console Parts replacement

Covers replacement of speaker, bulkhead, handle, and palm rest assemblies.

Replacing XYZ Parts

Details replacement procedures for XY and Z mechanisms and control assembly.

Main Console parts replacement

Procedures for replacing main console components like fan assembly and main cable.

Casters and Brakes replacement

Instructions for replacing rear casters, front casters, and pedal mechanisms.

Front End Processor (FEP) Card Rack parts replacement

Details replacement of FEP card rack components like relay, transmitter, and receiver boards.

Back End Processor (BEP) parts replacement

Covers BEP replacement, including HDD and software installation procedures.

Main Power Supply replacement

Procedure for removing and installing the main power supply unit.

Patient I/O assembly replacement

Steps for removing and installing the patient I/O module.

Peripherals replacement

Covers replacement of peripherals like DVD drive and printers.

Cables replacement

Instructions for replacing internal cables, including TwinAx PCIe cable.

Chapter 9 Renewal Parts

List of Abbreviations

Provides a list of abbreviations used throughout the renewal parts section.

Software for Vivid E80/E90/E95

Lists available software packages and their part numbers.

Covers and Bumpers

Details part numbers and descriptions for system covers and bumpers.

Top Console parts

Lists parts for the main monitor, LCD arm, and operating panel.

Alphanumeric (AN) Keyboard parts

Provides part numbers for various alphanumeric keyboards.

Speaker and Bulkhead parts

Lists part numbers for loudspeakers and bulkhead components.

XYZ parts

Lists replacement parts for the XYZ mechanism and related components.

Main Console parts

Details part numbers for main console components like fan tray and handles.

Casters (wheels) parts

Lists part numbers for casters, wheels, and pedal mechanism components.

Front End Processor (FEP) Card Rack parts

Lists replacement parts for the FEP card rack, including boards.

Back End Processor (BEP) parts

Details replacement parts for the BEP, including graphics cards and PSU.

Main Power Supply

Lists the part number for the main power supply unit.

I/O modules parts

Lists the part number for the Patient I/O module.

Peripherals for use with Vivid E80/E90/E95

Lists replacement peripherals including DVD drive and printers.

Mains power cables - Vivid E80/E90/E95

Lists part numbers for mains power cables for various regions.

Internal Cables - Vivid E80/E90/E95

Lists part numbers for internal system cables.

ECG cables - Vivid E80/E90/E95

Lists part numbers for various ECG cable sets and leadwires.

Physio TX parts

Lists parts for the Physio TX system, including microphones.

Probes for Vivid E80/E90/E95

Lists replacement probes categorized by type: sector, linear, convex, Doppler.

Options - Vivid E80/E90/E95

Lists available system options, including DVD drive and footswitch.

Chapter 10 Care and Maintenance

Overview

Discusses periodic maintenance and customer quality assurance programs.

Why do maintenance

Explains the importance of maintenance for quality assurance and accreditation.

Maintenance task schedule

Provides a schedule for recommended maintenance tasks and intervals.

Related product manuals