IRECTION FR091521, REVISION 1 VIVID S60N/VIVID S70N BASIC SERVICE MANUAL
Chapter 2 - Site Preparations 2-1
PRELIMINARY
Chapter 2
Site Preparations
Section 2-1
Overview
2-1-1 Purpose of Chapter 2
This chapter provides the information required to plan and prepare for the setup of a Vivid™ S60N or
Vivid™ S70N ultrasound unit. Included are descriptions of the electrical and facility requirements that
must be met by the purchaser. A worksheet is provided at the end of this chapter (see Figure 2-5 on
page 2-13) to help ensure that all the required network information is available, prior to setup.
2-1 Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2-2 Console Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2
2-3 Facility Needs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
2-4 Connectivity Installation Worksheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-13

Table of Contents

Other manuals for GE Vivid S70N

Related product manuals