EasyManua.ls Logo

Gecko waterlab - Installation and Connections; General Setup in Spa; Important Notice

Gecko waterlab
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
. Installation and Connections
General setup in spa
Install the chamber on a dedicated
bypass and connect the outlet directly
to the spa tub
The chamber must be installed after
the filter
The chamber must be installed before
any water treatment device (UV,
Ozonator, etc.)
Piping and hardware are at
the discretion of the installer.
Our recommendations :
Use /-inch, /-inch, or /-inch
tubing for the deviation line to the
chamber
Use PVC piping solvent glue to install
parts on reading chamber valves
The minimum recommended flow in the chamber is . GPM.
Main
Spa tub
Chamber installation position and orientation
The chamber must be accessible for valve
manipulations, draining, probe installation,
and pressure gauge reading.
The chamber should be oriented so that the probe
and valves are at a vertical angle of +/-°
in any direction.
This ensures correct probe functioning and allows
air to flow out of the chamber
The probe must be kept in temperature above °C (°F).
The probe must avoid long air exposure (over  min).
Prior to any installation procedures, turn off the power of the spa
Important notice

Related product manuals